Skip links

BatchLine case study: Cyto-Facto

Revolutionize your approach to Cell and Gene Therapy manufacturing with the BatchLine Electronic Batch Record (EBR) system. Our recent implementation for a leading Contract Development and Manufacturing Organization (CDMO) has generated substantial benefits, showcasing improvements in efficiency, data integrity, and resource savings. 

Achieving full implementation and validation within an impressive 4.5 months, BatchLine ensures rapid adoption. Our comprehensive training and batch specifications design empower operators to become proficient in just 1 month, minimizing downtime and maximizing productivity. 
 
The results speak volumes
A remarkable 50% reduction in QA review time, a 30% decrease in paper-related issues, and a significant 1-hour timesaving per batch for operators. Embrace the future of manufacturing efficiency.

 

Download the full case study

Subscribe for regular updates and news.

Leave a comment